WAR CABINET WEEKLY RESUME ( N o . 191) of the NAVAL, MILITARY AND AIR SITUATION from 0700 April 22nd, to 0700 April 29th, 1943

Source : National Archives UK – WP (43) 182

France.

Billancourt.—The U.S.A.A.F. attack on the Renault Works achieved considerable success and it is at present estimated that three months will elapse before anything approaching normal production will be possible. The turning-shop received two direct hits. Two-thirds of the lathes were rendered unserviceable and the remainder need repair. The transmission belting was cut and the roofing collapsed. The shop for finished lorries received six direct hits, resulting in 25 per cent, of the lorries being rendered useless, 25 per cent, being damaged but repairable, the remainder being serviceable. The joinery shop was completely wrecked by four direct hits. The spare parts store and the workmen’s rest room a n d canteen were destroyed.

Laisser un commentaire

Votre adresse e-mail ne sera pas publiée. Les champs obligatoires sont indiqués avec *

Ce site utilise Akismet pour réduire les indésirables. En savoir plus sur comment les données de vos commentaires sont utilisées.